Reinforcement works of the factory located in İzmir Çiğli Organized Industrial Site, completely painted sheet panel coating, construction of the load bearing system of the managerial building according to steel construction carcass system, cladding side construction with silicon glass and composite panels, heating, cooling (Hvac) and completion of electrical installation and landscaping.
